Project Name

Edge House

Location

Miami

Edge House, Miami ABOUT

Edge House offers a unique living space that combines modern luxury and aesthetics in the vibrant Edgewater neighborhood of Miami. With its 57-story iconic design and fully equipped apartments created by award-winning interior designer Adriana Hoyos, this project provides a wide range of options, from one-bedroom studios to three-bedroom residences. Edge House elevates the living experience with its exceptional residential amenities, wellness-focused spa, fitness center, and social spaces. Additionally, its prime location allows for easy access to popular Miami areas.

KEY FEATURES OF THE PROJECT

  • Iconic Design: 57-story building designed by Kobi Karp.
  • Interior Design: Stylish interiors by Adriana Hoyos Design Studio.
  • Social Amenities: Two swimming pools, spa, fitness center, yoga studio, co-working spaces, and private meeting rooms.
  • Pet-Friendly: Offering pet-friendly environments for residents.
  • Sustainability: Features sustainable building technology and easy access to popular Miami areas.

ABOUT THE LOCATION OF THE PROJECT

Edge House is located in the Edgewater neighborhood of Miami, which offers the perfect blend of modern living and historical charm. The area stands out with its proximity to the beach, vibrant art galleries, trendy restaurants, and green spaces. Edgewater is ideal for those seeking both a tranquil and dynamic lifestyle, with easy access to Miami’s cultural and commercial hubs.

PROJECT LOCATION

  • Midtown Miami: 2.1 km
  • Wynwood: 2.2 km
  • Downtown Miami: 2.4 km
  • Design District: 2.7 km
  • Brickell: 4 km
  • Miami Beach: 6.4 km
  • Miami International Airport: 11.3 km

PROJECT PRICING AND PAYMENT PLAN

  • Price Range:
    • 1+0 units from $513,000
    • 1+1 units from $750,000
    • 2+2 units from $1,055,250
  • Payment Plan:
    • 5% due at signing (within 48 hours of receiving the offer)
    • 5% due 15 days after signing
    • 10% due 45 days after signing
    • 10% due at foundation stage
    • 10% due at 25th floor completion
    • 10% due at roof closure
    • 50% due at delivery

PROJECT COMPLETION DATE

  • Foundation Start: Second quarter of 2025
  • Delivery: Second quarter of 2027